Sand Brook Bridge Replacement
This municipal design project was an existing stream crossing over Sand Brook on Gould Pond Road in Hillsborough. Northpoint worked directly with the Town on the design of a replacement structure for an existing 96-inch culvert. A new 13-foot wide by 6-foot high, rigid frame, box culvert was designed and installed. Northpoint administered the permitting process through NHDES and provided bidding and construction observation services.