This design project was a 50-unit cluster subdivision located in the Town of Barrington, New Hampshire. The subject parcel was 163 -acres in size and was located on NH Route 202 and NH Route 9.
The design included approximately 6,500-feet of roadway with access from NH Rte. 202. The design of the roadways included underground utilities, including private water and sewer, as well as a private storm drainage system. A 650-feet gravel access road was designed from the proposed subdivision roadway to the adjacent golf course. The fifty residential units were designed as single-family units with individual lots.
Northpoint provided all components of the civil/site engineering design and administered the local and state permitting processes.