Christian Farm Estates

On behalf of the Town of New Boston Planning Board, Northpoint Engineering performed technical review of the design plans during the local approval process. When the project proceeded to construction, Northpoint commenced construction monitoring and administration services on behalf of the Town to verify the proposed infrastructure improvements were constructed to the approved plans.

The proposed 24-lot single-family subdivision is accessed from Christian Farm Drive, a 2,900 linear foot cul-de-sac off of NH Route 136.  Infrastructure improvements associated with the roadway included: underdrain, open drainage systems, three stormwater management basins, wetland crossing with retaining walls and guardrail, underground utilities, and a 30,000 gallon fire cistern.